HomeIndiaProtocol to the Agreement between India and Bangladesh concerning the demarcation of...

Protocol to the Agreement between India and Bangladesh concerning the demarcation of the land boundary between India and Bangladesh and related matters

The Government of the Republic of India and the Government of the People’s Republic of Bangladesh,

Bearing in mind the friendly relations existing between the two countries,

Desiring to define more accurately at certain points and to complete the demarcation of the land boundary between India and Bangladesh,

Having regard to the Agreement between the Government of the Republic of India and the Government of the People’s Republic of Bangladesh concerning the demarcation of the land boundary between India and Bangladesh and related matters, May 16, 1974 and Exchange of Letters dated December 26, 1974; December 30, 1974; October 7, 1982; and March 26, 1992 (hereinafter referred to as the 1974 Agreement),

Have agreed as follows:

ARTICLE 1

The provisions of this Protocol shall form an integral part of the 1974 Agreement.

ARTICLE 2

(I) Article 1 Clause 5 of the 1974 Agreement shall be implemented as follows:

Muhuri River (Belonia) sector

Boundary in this segment shall be drawn westwards from the existing Boundary Pillar No. 2159/48-S along the agreed line as depicted in the index map prepared jointly till it meets the southern limit of the Burning Ghat as shown in jointly surveyed map of Muhuri river area in 1977-78. Thereafter it shall follow the external limit of the Burning Ghat in South-West direction and then turn northwards along the external limit of the Burning Ghat till it meets the centre of the existing Muhuri River. Thereafter it shall run along the mid stream of the existing Muhuri River upto Boundary Pillar No. 2159/3-S. This boundary shall be the fixed boundary. The two Governments should raise embankments on their respective sides with a view to stabilising the river in its present course as stipulated in the 1974 Agreement. The Parties agree to fencing on ‘zero line’ in this area.

(II) Article 1 Clause 12 of the 1974 Agreement shall be implemented as follows:

Enclaves

111 Indian Enclaves in Bangladesh and 51 Bangladesh Enclaves in India as per the jointly verified cadastral enclave maps and signed at the level of DGLR&S, Bangladesh and DLR&S, West Bengal (India) in April 1997, shall be exchanged without claim to compensation for the additional areas going to Bangladesh.

(III) Article 1 Clause 15 of the 1974 Agreement shall be implemented as follows:

Lathitilla and Dumabari

Line drawn by Radcliffe from Boundary Pillar 1397(point Y) i.e. the last demarcated boundary pillar position, straight southward to the tri-junction of Mouzas Dumabari, Lathitilla and Bara Putnigaon i.e upto iron bridge, and thence it shall run generally southwards along the midstream of the course of Putni Chara as already demarcated on the ground, till it meets the boundary between Sylhet (Bangladesh) and Tripura (India) i.e. Boundary Pillar No. 1800.

(IV) The land boundary in the area mentioned below shall be demarcated in the following manner:

Daikhata 56 (West Bengal-Jalpaiguri) / Panchagarh

Boundary in this segment shall be drawn as fixed boundary from existing Boundary Pillar 774/32-S in the strip sheet 444/6 along the mouza boundary of Daikhata-56 as surveyed in 1997-98 and thereafter will follow the southern boundary of Daikhata-56 (from east to west) upto Point No 18 and therefrom it will follow the western boundary of Daikhata-56 (from south to north) till it meets the center of River Sui at Point No 15 and thereafter, will run along the center of the River Sui upto Point No 1, the points as depicted in the sketch map jointly prepared and mutually agreed on August 3, 2011. Thereafter the International Boundary shall follow the already delineated boundary through Main Pillar (MP) 775.

ARTICLE 3

(I) Article 2 of the 1974 Agreement shall be implemented as follows:

The Government of India and the Government of Bangladesh agree that the boundary shall be drawn as a fixed boundary for territories held in Adverse Possession as determined through joint survey and fully depicted in the respective adversely possessed land area index map (APL map) finalized by the Land Records and Survey Departments of both the countries between December 2010 and August 2011, which are fully described in clause (a) to (d) below.

The relevant strip maps shall be printed and signed by the Plenipotentiaries and transfer of territorial jurisdiction shall be completed simultaneously with the exchange of the enclaves. The demarcation of the boundary, as depicted in the above-mentioned Index Maps, shall be as under:­

(a) West Bengal Sector

(i) Bousmari – Madhugari (Kushtia-Nadia) area The boundary shall be drawn from the existing Boundary Pillar Nos. 154/5-S to 157/1-S to follow the centre of old course of river Mathabanga, as depicted in consolidation map of 1962, as surveyed jointly and agreed in June 2011.

(ii) Andharkota (Kushtia-Nadia) area The boundary shall be drawn from existing Boundary Pillar No 152/5-S to Boundary Pillar No 153/1-S to follow the edge of existing River Mathabanga as jointly surveyed and agreed in June 2011.

(iii) Pakuria (Kushtia-Nadia) area The boundary shall be drawn from existing Boundary Pillar No 151/1-S to Boundary Pillar No 152/2-S to follow the edge of River Mathabanga as jointly surveyed and agreed in June 2011.

(iv) Char Mahishkundi (Kushtia-Nadia) area The boundary shall be drawn from existing Boundary Pillar No 153/1-S to Boundary Pillar No 153/9-S to follow the edge of River Mathabanga as jointly surveyed and agreed in June 2011.

(v) Haripal/ Khutadah/ Battoli/ Sapameri/ LNpur (Patari) (Naogaon-Malda) area The boundary shall be drawn as line joining from existing Boundary Pillar No 242/S/13, to Boundary Pillar No 243/7-S/5 and as jointly surveyed and agreed in June 2011.

(vi) Berubari (Panchagarh-Jalpaiguri area) The boundary in the area Berubari (Panchagarh-Jalpaiguri) adversely held by Bangladesh, and Berubari and Singhapara- Khudipara (Panchagarh-Jalpaiguri), adversely held by India shall be drawn as jointly demarcated during 1996-1998.

(b) Meghalaya Sector

(i) Lobachera-Nuncherra The boundary from existing Boundary Pillar No 1315/4-S to Boundary Pillar No 1315/15-S in Lailong -Balichera, Boundary Pillar No 1316/1-S to Boundary Pillar No 1316/11-S in Lailong-Noonchera, Boundary Pillar No 1317 to Boundary Pillar No 1317/13-S in Lailong-Lahiling and Boundary Pillar No 1318/1-S to Boundary Pillar No 1318/2-S in Lailong-Lubhachera shall be drawn to follow the edge of tea gardens as jointly surveyed and agreed in Dec 2010.

(ii) Pyrdiwah/ Padua Area The boundary shall be drawn from existing Boundary Pillar No 1270/1-S as per jointly surveyed and mutually agreed line till Boundary Pillar No 1271/1-T. The Parties agree that the Indian Nationals from Pyrdiwah village shall be allowed to draw water from Piyang River near point No 6 of the agreed Map.

(iii) Lyngkhat Area

(aa) Lyngkhat-I / Kulumcherra & Lyngkhat-II/ Kulumcherra

The boundary shall be drawn from existing Boundary Pillar No. 1264/4-S to Boundary Pillar No 1265 and BP No 1265/6-S to 1265/9-S as per jointly surveyed and mutually agreed line.

(ab) Lyngkhat-III/ Sonarhat

The boundary shall be drawn from existing Boundary Pillar No 1266/13-S along the nallah southwards till it meets another nallah in the east-west direction, thereafter it shall run along the northern edge of the nallah in east till it meets the existing International Boundary north of Reference Pillar Nos.1267/4-R-B and 1267/3-R­ I.

(iv) Dawki/ Tamabil area The boundary shall be drawn by a straight line joining existing Boundary Pillar Nos 1275/1-S to Boundary Pillar Nos 1275/7-S. The Parties agree to fencing on ‘zero line’ in this area.

(v) Naljuri/ Sreepur Area

(aa) Naljuri I

The boundary shall be a line from the existing Boundary Pillar No 1277/2-S in southern direction upto three plots as depicted in the strip Map No 166 till it meets the nallah flowing from Boundary Pillar No 1277/5-T, thereafter it will run along the western edge of the nallah in the southern direction upto 2 plots on the Bangladesh side, thereafter it shall run eastwards till it meets a line drawn in southern direction from Boundary Pillar No 1277/4-S.

(ab) Naljuri III

The boundary shall be drawn by a straight line from existing Boundary Pillar No 1278/2-S to Boundary Pillar No 1279/ 3-S.

(vi) Muktapur/ Dibir Hawor Area

The Parties agree that the Indian Nationals shall be allowed to visit Kali Mandir and shall also be allowed to draw water and exercise fishing rights in the water body in the Muktapur / Dibir Hawor area from the bank of Muktapur side.

(c) Tripura Sector

(i) Chandannagar-Champarai Tea Garden area in Tripura/ Moulvi Bazar sector

The boundary shall be drawn along Sonaraichhera river from existing Boundary Pillar No 1904 to Boundary Pillar No 1905 as surveyed jointly and agreed in July 2011.

(d) Assam Sector

(i) Kalabari (Boroibari) area in Assam sector The boundary shall be drawn from existing Boundary Pillar No 1066/24-T to Boundary Pillar No 1067/16-T as surveyed jointly and agreed in August 2011.

(ii) Pallathal area in Assam sector

The boundary shall be drawn from existing Boundary Pillar No. 1370/3-S to 1371/6-S to follow the outer edge of the tea garden and from Boundary Pillar No. 1372 to 1373/2-S along outer edge of the pan plantation.

ARTICLE 4

This Protocol shall be subject to ratification by the Government of the Republic of India and the Government of the People’s Republic of Bangladesh and shall enter into force on the date of exchange of Instruments of Ratification.

Signed at Dhaka on the Sixth day of September, 2011, in two originals in the English language.

For the Government of the
Republic of India
For the Government of the People’s
Republic of Bangladesh

Source

Stay Connected
255FansLike
473FollowersFollow
Must Read
Related News